Steel building costs per m² in Ireland
An erected hot-rolled CE-marked steel portal building in Ireland costs €260 to €580/m² ex VAT from single-skin non-drip shell to 60–100 mm PIR insulated composite cladding on a prepared base. Cold-rolled galvanised C-section frames start from €220/m² erected. Adding pad footings and a power-floated C35 concrete slab adds €150 to €240/m², bringing shell-plus-civils to €540 to €880/m².
Line-by-line ex-VAT rates for hot-rolled and cold-rolled steel frames, PIR composite panels, C35 slabs, roller shutters and mezzanine floors.
Free, no obligation. One local fabricator prices it, not five.
- €260–€580/m²erected shell to PIR insulated, ex VAT
- €150–€240/m²pad footings & power-floated C35 slab
- €900–€1,250/m²turnkey commercial unit with offices
- €110–€170/m²structural steel mezzanine deck

Erected rates across six steel building types
Typical Irish ex-VAT budgets by building category and floor area.

Commercial workshop (100–300 m²)
From €290/m²Hot-rolled CE-marked frame, erected ex slab, ex VAT- Single-skin non-drip shell€290–€380/m²
- 60–100 mm PIR insulated€400–€560/m²
- Insulated + pads & C35 slab€560–€790/m²
- Typical 150 m² insulated shell€60,000–€84,000

Industrial warehouse (300–1,000 m²+)
From €260/m²Clear-span 6–8 m eaves hot-rolled portal frame, ex VAT- Single-skin shell (350 m²)€265–€350/m²
- PIR insulated shell (350 m²)€375–€530/m²
- Insulated + C35 floor slab€535–€760/m²
- Turnkey commercial M&E€900–€1,250/m²

Insulated domestic steel garage (40–100 m²)
From €340/m²Condensation-free 40–60 mm PIR panels, roller door, ex slab- Single-skin non-drip (60 m²)€310–€410/m²
- PIR insulated shell (60 m²)€420–€590/m²
- Typical 60 m² insulated unit€25,000–€35,500
- Electric roller door (to 3 m)€1,400–€2,500

Cold-rolled galvanised portal (up to 15 m)
From €220/m²Pre-punched galvanised C-section bolt-together frame- Under 80 m² shell erected€250–€340/m²
- 80–200 m² shell erected€220–€300/m²
- 80–200 m² PIR insulated€330–€480/m²
- Fabrication lead time3–6 weeks

Equestrian indoor arena & stable span
From €195/m²20 m+ clear-span hot-rolled portal roof & vented cladding- Large 750 m²+ arena shell€195–€265/m²
- Mid 350 m² stable span€215–€290/m²
- Typical 750 m² arena shell€146,500–€199,000
- Daylight rooflight panels€65–€110/panel

Mezzanine, offices & roller shutters
From €460/m²Insulated portal build with structural steel upper deck- Mezzanine steel deck (5 kN/m²)€110–€170/m²
- Industrial 4×4.5 m shutter€2,800–€6,200
- Insulated sectional door€3,400–€7,200
- 350 m² turnkey + mezzanine€224,000–€322,000
Slabs, shutters, mezzanines and M&E line items
Pad footings & C35 power-floated slab
€150–€240/m²
Excavation, stone sub-base, DPM, A393 mesh or steel fibres and power-trowelled C35 concrete.
Structural steel mezzanine floor
€110–€170/m²
Freestanding 4.8 kN/m² steel deck, 38 mm particleboard, staircase, handrail and pallet gate.
Industrial electric roller shutter
€2,800–€6,200
Heavy-gauge 4 m × 4.5 m three-phase steel shutter with wind-lock guides and safety brake.
Insulated sectional overhead door
€3,400–€7,200
40 mm foam-filled commercial sectional door with vision panels and perimeter weather seals.
Domestic / small electric roller door
€1,400–€2,500
Insulated aluminium slat roller door up to 3 m wide for garages and compact workshops.
Steel personnel & fire escape door
€850–€1,450
Powder-coated multi-point lock PA door or panic push-bar fire exit fitted into side rails.
GRP clear daylight roof lights
€65–€110/panel
Triple-skin insulated or single-skin Class B non-fragile roof lights covering 10–15% of roof area.
Three-phase ESB Networks upgrade
€3,500–€12,000
MIC connection fee, trench ducting and commercial sub-board; varies with distance to transformer.
Planning, FSC, DAC & BCAR fees
€5,500–€14,000
Architect/engineer drawings, fire cert, disability access cert and Assigned Certifier inspections.
Review detailed engineering specs on pad footings and concrete slabs and roller shutters and rooflights.
Price my steel building
Four quick taps and our Irish guide price shows before we ask for a phone number. One local fabricator rings you, not five.
A commercial steel workshop, around 150 m² (80 to 200 m²), 60–100 mm PIR insulated shell erected: €60,000 to €84,000 (€400–€560/m²), ex VAT.
How the m² price is worked out
Figures reflect going Irish supply-and-erect rates ex VAT for CE-marked IS EN 1090-2 portal-frame buildings at typical 4 m to 6 m eaves. Shell rates cover fabricated columns, rafters, purlins, wind bracing, sheeting, gutters and erection on a prepared base. Insulated options add 60–100 mm PIR composite panels and roller doors. Slab options add excavated pad footings and a 150–200 mm power-floated C35 floor. Exposed Atlantic wind zones, rock excavation, three-phase ESB connections and BCAR fees are priced on survey.
Cladding supply benchmarks and turnkey rates
Single-skin 0.7 mm non-drip sheet
€14–€20/m²
Supply-only rate ex VAT; anti-condensation fleece backing for unheated stores and arenas.
40 mm PIR composite panel
€22–€28/m²
Supply only ex VAT (~0.52 W/m²K); stops dripping in domestic garages and dry tool stores.
60 mm PIR composite panel
€26–€34/m²
Supply only ex VAT (~0.36 W/m²K); widely specified for light commercial workshops.
80 mm PIR composite panel
€31–€40/m²
Supply only ex VAT (~0.27 W/m²K); strong thermal control for heated depots.
100 mm PIR composite panel
€36–€48/m²
Supply only ex VAT (~0.21 W/m²K); meets non-domestic Part L wall backstops cleanly.
Turnkey heavy-crane industrial build
€1,300–€1,800/m²
Heavy UB crane beams, 8 m+ eaves, heavy slab, full offices, fire separation and BCAR.
Compare envelope U-values on PIR composite cladding and check tax rules on commercial VAT and RCT.
Six technical factors that shift a steel tender
- Clear span and eaves height. Jumping from 4 m to 7 m eaves adds column tonnage, deeper concrete pads, larger mobile cranes and higher wall cladding area.
- County Eurocode 1 wind loading. Coastal sites in Kerry, Clare, Galway, Mayo and Donegal demand heavier rafters, closer purlin spacing and beefed-up bracing.
- Ground bearing capacity. Soft clay, peat pockets or made ground can double pad footing costs or trigger piled ground beams before steel arrives.
- Insulation and Part L compliance. Moving from single-skin fleece sheets to 80–100 mm PIR composite panels adds €110 to €180/m² erected across walls and roof.
- Crane beams and internal mezzanines. Supporting a 5-tonne overhead gantry or an upper office deck requires heavier columns and dedicated baseplates from day one.
- Commercial VAT and RCT status. Supply-only kits carry 23% VAT; erected contracts follow the two-thirds rule or commercial VAT reverse charge under eRCT.
Ten lines every written steel tender should include
Use this checklist to compare structural steel quotes on equal terms.
- IS EN 1090-2 EXC2 CE certificate. Confirm the fabricator issues a signed Declaration of Performance and EN 10025 3.1 steel mill certs.
- Eurocode 1 Irish wind-zone design. State site wind velocity (24 to 30 m/s), altitude factor and terrain category explicitly on the calculation pack.
- Steel section sizes and protective coating. List UB/UC column and rafter weights, haunch depth, and hot-dip galvanising (EN ISO 1461) vs zinc-phosphate primer.
- Cladding core thickness and U-value. Specify single-skin non-drip fleece gauge or 40, 60, 80 or 100 mm PIR composite panel thickness and external RAL colour.
- Clear internal eaves height and bay spacing. Measure clear working height below the haunch, not just outside wall height, especially for pallet racking or vehicle lifts.
- Pad foundations and holding-down bolts. Clarify who supplies anchor bolt cages, pours reinforced concrete pads and certifies sub-base bearing capacity.
- Concrete slab thickness and finish. Confirm 150 to 200 mm C35/45 concrete, A393 mesh or steel fibres, damp-proof membrane and power-floated tolerance.
- Roller shutters, fire doors and rooflights. List opening widths, three-phase or single-phase motors, wind-lock guides, emergency push-bar doors and 10–15% GRP roof lights.
- Craneage, telehandlers and welfare on site. Confirm whether mobile crane hire, MEWPs, safety netting and edge protection sit inside the erection figure.
- VAT treatment and payment milestones. State 13.5% vs 23% VAT or RCT reverse charge clearly, alongside drawing sign-off, steel delivery and completion stages.
Key questions before ordering structural steel
What does a 200 m² insulated commercial steel workshop cost in Ireland?
An erected 200 m² hot-rolled PIR-insulated shell typically runs €76,000 to €112,000 ex VAT before groundworks. Adding pad footings, a 150–200 mm C35 concrete slab and electric roller doors puts shell-plus-civils around €112,000 to €160,000 ex VAT.
How much cheaper is a supply-only steel kit than erected?
A flat-pack cold-rolled or hot-rolled steel kit supply-only runs roughly 35% to 45% below the erected figure, once you exclude crane hire, telehandlers, edge netting, certified erection crews and 23% vs 13.5% VAT treatment.
Why do small steel buildings cost more per m² than large warehouses?
A 60 m² garage still needs two full gable frames, crane delivery, flashing profiles, gutters and doors. Spreading those fixed costs over 500 m² drops the per-m² rate sharply.
Does a steel building quote normally include foundations and floor slab?
Usually no. Most Irish steel fabricators quote supply-and-erect onto finished, certified pad foundations and a level concrete base. Civil groundworks are priced either by a separate groundworks contractor or as a turnkey package.
How much does a mezzanine floor add inside a steel warehouse?
A freestanding 4.8 kN/m² structural steel mezzanine deck with stairs, handrail and pallet gate typically adds €110 to €170/m² of mezzanine area ex VAT, before fire-rating soffit board or office fit-out.
Are BCAR and Fire Safety Certificate fees included in fabricator prices?
No. Statutory design certification, FSC, DAC and Assigned Certifier fees are contracted directly with an architect, chartered engineer or building surveyor, typically €5,500–€14,000 on small-to-mid commercial units.
Every steel building page and engineering guide
Building types
Engineering & civils

Check your per-m² budget before a fabricator rings
Pick the building type, rough m² footprint and cladding or slab scope. When you want a written tender, your details go to a single Irish steel fabricator in your county.