VAT and Relevant Contracts Tax (RCT) on steel buildings
Supply-only steel building kits carry 23% VAT. Permanently erected supply-and-fit steel structures carry 13.5% VAT only when materials stay at or below two-thirds of the VAT-exclusive contract price; above two-thirds, 23% applies unless commercial VAT reverse charge under eRCT operates between principal and subcontractor.
How Revenue's two-thirds rule, supply-only 23% VAT, commercial reverse charge and eRCT apply to Irish steel portal contracts.
Free, no obligation. One local fabricator prices it, not five.
- 13.5%reduced VAT on fixed erection (<=2/3 mats)
- 23%standard VAT on supply-only kits
- 0% / 20% / 35%Revenue eRCT subcontractor rates
- Reverse chargeB2B construction VAT mechanism

Three ways VAT applies to an Irish steel building invoice
Supply-only steel kit (DIY or separate erector)
- VAT treatment
- 23% standard VAT
- Key Revenue condition
- Goods supply with no erection; always invoiced at 23% VAT.
Supply & erect to a private or non-principal buyer
- VAT treatment
- 13.5% or 23% (two-thirds rule)
- Key Revenue condition
- 13.5% if materials <= 2/3 of net invoice; if steel + PIR panels exceed 2/3, the entire invoice moves to 23%.
Subcontractor erecting for a Principal Contractor
- VAT treatment
- 0% VAT Reverse Charge + eRCT
- Key Revenue condition
- Principal accounts for 13.5% VAT on their own VAT return and notifies the contract on ROS eRCT.
Price my steel building
Four quick taps and our Irish guide price shows before we ask for a phone number. One local fabricator rings you, not five.
A commercial steel workshop, around 150 m² (80 to 200 m²), insulated shell with pads and C35 concrete slab: €84,000 to €118,500 (€560–€790/m²), ex VAT.
How the m² price is worked out
Figures reflect going Irish supply-and-erect rates ex VAT for CE-marked IS EN 1090-2 portal-frame buildings at typical 4 m to 6 m eaves. Shell rates cover fabricated columns, rafters, purlins, wind bracing, sheeting, gutters and erection on a prepared base. Insulated options add 60–100 mm PIR composite panels and roller doors. Slab options add excavated pad footings and a 150–200 mm power-floated C35 floor. Exposed Atlantic wind zones, rock excavation, three-phase ESB connections and BCAR fees are priced on survey.
Practical tax checks for Irish business buyers
- Watch the two-thirds material threshold on insulated builds. Heavy S355 steel plus 100 mm PIR panels and electric shutters can exceed two-thirds of a supply-and-erect invoice; ask your fabricator whether they quote 13.5% or 23% VAT.
- VAT-registered companies reclaim input VAT. An active VAT-registered Irish trading business erecting a commercial workshop or warehouse normally reclaims 100% of qualifying VAT on steel, cladding and civils.
- Check whether your firm is a Principal Contractor for RCT. Under Revenue rules, certain businesses erecting commercial buildings (including developers and connected entities) must register contracts and payment notifications on ROS eRCT before paying subcontractors.
- Separate groundworks vs turnkey contracts. Bundling excavation, concrete pads and C35 slab labour into a single design-and-build contract increases the labour share relative to steel materials.
Related steel building guides
Steel building cost per m²Complete Irish €/m² breakdown from shell to insulated turnkey and civils.
Planning, FSC, DAC & BCARFull commercial planning, domestic 30 m² Class 3 cap, FSC, DAC and BCMS.
Pad footings & C35 slabsReinforced concrete pads, holding-down bolts and power-floated floor slabs.
Commercial workshops100 to 300 m² hot-rolled steel depots, roller shutters and power-floated floors.
Industrial warehouses300 to 1,000 m²+ high-eave logistics units, dock levellers and Part L specs.
Build timeline & erectionPlanning, BCAR, shop drawings, EN 1090 fabrication and crane erection weeks.Key questions before ordering structural steel
Why did one steel fabricator quote 13.5% VAT and another quote 23%?
Under Revenue's two-thirds rule, if fabricated steel and composite panels exceed two-thirds of the VAT-exclusive contract sum, the entire invoice moves from 13.5% to 23% VAT. Turnkey packages with high site labour and concrete work stay under two-thirds more easily.
Can my limited company reclaim VAT on building a commercial workshop?
Generally yes, provided the company is VAT-registered and uses the steel building exclusively for VAT-taxable commercial trading activities. Confirm capital goods scheme (CGS) records with your accountant.
What is VAT Reverse Charge on commercial steel erection?
When a VAT-registered subcontractor supplies construction operations (such as steel erection and cladding) to a Principal Contractor under RCT, the subcontractor invoices 0% VAT and the Principal accounts for the VAT directly on their VAT3 return.
Does a private homeowner building a domestic steel garage deal with RCT?
No. Private individuals building a detached domestic garage for personal use are not Principal Contractors; they simply pay the applicable 13.5% or 23% VAT stated on the fabricator's invoice.
Every steel building page and engineering guide
Building types
Engineering & civils

Check your per-m² budget before a fabricator rings
Pick the building type, rough m² footprint and cladding or slab scope. When you want a written tender, your details go to a single Irish steel fabricator in your county.