Industrial steel warehouses and logistics units

Erected industrial steel warehouse shells in Ireland run €245 to €350/m² in single-skin sheeting and €355 to €530/m² with 80–100 mm PIR composite cladding (ex slab, ex VAT). Full turnkey commercial warehouses with heavy C35 slabs, offices, three-phase M&E and BCAR typically land at €900 to €1,250/m².

Clear-span 300 to 1,000 m²+ hot-rolled portal buildings with 6–10 m eaves, pallet racking slabs and commercial dock access.

Free, no obligation. One local fabricator prices it, not five.

  • €245–€530/m²erected shell to insulated, ex VAT
  • €900–€1,250/m²turnkey warehouse + offices + M&E
  • 6.0–10.0 mclear eaves for multi-tier racking
  • 15–35 m+column-free hot-rolled portal span
Twin-span profiled steel industrial warehouse with wide sliding doors and daylight clerestory panels

Designing clear spans and racking height efficiently

In Irish distribution and manufacturing units, structural steel tonnage rises sharply once clear spans exceed 25 m or eaves pass 8 m. For buildings wider than 30 m, switching to a twin-span portal frame with a single line of central columns aligned inside a pallet-racking aisle cuts primary steel weight by 15% to 25% without losing usable floor space. Bay centres typically sit at 6.0 m to 7.5 m to match standard purlin spans and articulated loading dock widths.

350 m² regional unit (15 × 24 m)

Erected insulated shell (ex slab)
€131,500 to €185,500
Key engineering focus
6 m eaves, 80–100 mm PIR cladding, two 4.5 m insulated sectional doors.

750 m² distribution hall (20 × 38 m)

Erected insulated shell (ex slab)
€266,500 to €375,000
Key engineering focus
7–8 m eaves, FM2 laser-screeded C35 floor slab, fire-rated office core.

1,200 m²+ logistics facility

Erected insulated shell (ex slab)
€900–€1,250/m² turnkey
Key engineering focus
Twin-span or wide portal, dock levellers, yard attenuation tank and full BCAR.

Price my steel building

Four quick taps and our Irish guide price shows before we ask for a phone number. One local fabricator rings you, not five.

An industrial steel warehouse, around 350 m² (200 to 500 m²), 60–100 mm PIR insulated shell erected: €131,500 to €185,500 (€375–€530/m²), ex VAT.

Step 1 of 5

What kind of steel building?

Pick the closest match. The fabricator confirms span and eaves height on site.

How the m² price is worked out

Figures reflect going Irish supply-and-erect rates ex VAT for CE-marked IS EN 1090-2 portal-frame buildings at typical 4 m to 6 m eaves. Shell rates cover fabricated columns, rafters, purlins, wind bracing, sheeting, gutters and erection on a prepared base. Insulated options add 60–100 mm PIR composite panels and roller doors. Slab options add excavated pad footings and a 150–200 mm power-floated C35 floor. Exposed Atlantic wind zones, rock excavation, three-phase ESB connections and BCAR fees are priced on survey.

Warehouse floor flatness, fire separation and Part L

  • Laser-screeded FM2 slab flatness. High-reach forklift aisles above 6 m racking require tight floor level tolerances and steel-fibre or double-mesh C35/45 concrete.
  • Boundary fire wall protection. Warehouses close to neighbouring industrial units need 60-minute mineral-wool core fire panels or intumescent-coated portal columns.
  • Part L NZEB airtightness. Heated logistics buildings must pass blower-door pressure testing at or below 5.0 m³/(h·m²) at 50 Pa, making dock shelters and insulated sectional doors essential.
  • Smoke venting and escape travel distances. Early Fire Safety Certificate design coordinates roof smoke vents and push-bar exit doors directly into the steel cladding layout.

Key questions before ordering structural steel

What does a 500 m² insulated steel warehouse cost in Ireland?

Budget €180,000 to €265,000 ex VAT for the erected hot-rolled PIR-insulated shell on prepared pads, rising to roughly €270,000 to €410,000 ex VAT with reinforced concrete slab and groundworks, or €450,000 to €625,000+ turnkey with offices and M&E.

Is single-span or twin-span cheaper for a 30 m wide warehouse?

A twin-span portal with a central column line aligned to racking aisles uses considerably less steel tonnage than a 30 m clear-span rafter, while keeping full forklift mobility.

How long does an industrial warehouse take from planning to handover?

Allow 12 to 24 weeks for planning, FSC, DAC and BCMS commencement, 6 to 10 weeks for hot-rolled EN 1090-2 fabrication, and 3 to 6 weeks for crane erection, cladding and floor fit-out.

Can solar PV panels go onto a warehouse steel roof later?

Only if the dead load (typically 0.15 to 0.25 kN/m²) is engineered into the portal rafters and roof purlins during initial structural design. Tell the fabricator at quote stage.

Every steel building page and engineering guide

Grey steel-clad commercial workshop and trade depot with three white roller shutter doors on a gravel yard

Check your per-m² budget before a fabricator rings

Pick the building type, rough m² footprint and cladding or slab scope. When you want a written tender, your details go to a single Irish steel fabricator in your county.