  • €260–€580/m²erected shell to PIR insulated
  • IS EN 1090-2mandatory CE steel standard
  • 30 m²domestic Class 3 garage limit
  • 6–10 wkshot-rolled steel fabrication

Price my steel building

Four quick taps and our Irish guide price shows before we ask for a phone number. One local fabricator rings you, not five.

A commercial steel workshop, around 150 m² (80 to 200 m²), 60–100 mm PIR insulated shell erected: €60,000 to €84,000 (€400–€560/m²), ex VAT.

Step 1 of 5

What kind of steel building?

Pick the closest match. The fabricator confirms span and eaves height on site.

How the m² price is worked out

Figures reflect going Irish supply-and-erect rates ex VAT for CE-marked IS EN 1090-2 portal-frame buildings at typical 4 m to 6 m eaves. Shell rates cover fabricated columns, rafters, purlins, wind bracing, sheeting, gutters and erection on a prepared base. Insulated options add 60–100 mm PIR composite panels and roller doors. Slab options add excavated pad footings and a 150–200 mm power-floated C35 floor. Exposed Atlantic wind zones, rock excavation, three-phase ESB connections and BCAR fees are priced on survey.

Every question answered

How much does a steel building cost per m² in Ireland?

An erected hot-rolled CE-marked steel portal building in Ireland costs €260 to €580/m² ex VAT from single-skin non-drip shell to 60–100 mm PIR insulated composite cladding on a prepared base. Cold-rolled galvanised C-section frames start from €220/m² erected. Adding pad footings and a power-floated C35 concrete slab adds €150 to €240/m², bringing shell-plus-civils to €540 to €880/m².

What is the difference between hot-rolled and cold-rolled steel frames?

Hot-rolled frames use thick welded universal I-beams (UB/UC) suited to 12–35 m+ clear spans, mezzanines and overhead cranes. Cold-rolled frames use lighter galvanised C-section channels bolted back-to-back, cost less on spans up to 15 m, and erect quickly with smaller plant.

Is CE marking under IS EN 1090-2 legally mandatory in Ireland?

Every fabricated structural steel portal frame placed on the Irish market must carry a legal CE mark and Declaration of Performance under IS EN 1090-2 (EXC2 for commercial workshops and warehouses), engineered for local Irish wind loads under IS EN 1991-1-4 (24 to 30 m/s across inland to Atlantic coastal zones).

What thickness of PIR composite panel should I fit?

40 to 60 mm PIR stops condensation in domestic garages and unheated workshops. 80 to 100 mm+ PIR is standard on heated commercial workshops and offices to approach or meet Part L U-values (0.16 W/m²K roof, 0.21 W/m²K wall).

Do I need single-skin non-drip sheeting or insulated panels?

Single-skin steel with factory-applied anti-condensation fleece absorbs overnight moisture in unheated stores and equestrian arenas until ventilation clears it. Insulated composite panels prevent moisture forming at all and keep working spaces warm.

How thick should an industrial concrete floor slab be?

Standard commercial workshops and light warehouses pour 150 mm to 200 mm of C35/45 concrete reinforced with A393 steel mesh or structural fibres over compacted hardcore and a damp-proof membrane, finished by power-float.

Do commercial steel buildings need planning permission and BCAR?

Every new commercial workshop, industrial warehouse and equestrian indoor arena in Ireland requires full planning permission from the local authority, plus a Fire Safety Certificate (FSC), Disability Access Certificate (DAC) and BCAR Assigned Certifier where non-domestic floors or extensions exceed 25 m². Only detached non-commercial domestic garages behind the house qualify for Class 3 exemption, capped at 30 m² (increased from 25 m² on 27 July 2026 under S.I. No. 338 of 2026) and 3 m height for metal roofs.

When are a Fire Safety Certificate (FSC) and Disability Access Certificate (DAC) needed?

Every new commercial building and any non-domestic extension over 25 m² needs an FSC. A DAC is required wherever staff, offices or trade customers use the building.

Should structural steel be hot-dip galvanised or primed and painted?

Hot-dip galvanising to EN ISO 1461 protects steel inside coastal, damp or wash-down workshops for decades. Zinc-phosphate primer with industrial topcoat suits dry, enclosed insulated commercial buildings.

How much does a structural mezzanine floor cost per m²?

Supply and installation of a 4.8 kN/m² steel mezzanine deck with staircase, handrail and pallet gate runs €110 to €170/m² of deck area ex VAT.

What VAT rate and RCT rules apply to commercial steel builds?

Supply-only steel building kits carry 23% VAT. Permanently erected supply-and-fit steel structures carry 13.5% VAT only when materials stay at or below two-thirds of the VAT-exclusive contract price; above two-thirds, 23% applies unless commercial VAT reverse charge under eRCT operates between principal and subcontractor.

How long does it take to fabricate and erect a steel building?

Cold-rolled galvanised kits typically deliver in 3 to 6 weeks. Hot-rolled CE-marked EN 1090 portal frames take 6 to 10 weeks to detail, fabricate and coat, with crane erection and cladding taking 1 to 3 weeks on a cured concrete base.

What happens after I submit the steel building pricer?

Your footprint, cladding scope and county go to a single Irish steel fabricator in your county, and nobody else. They confirm span, wind zone and access before issuing a written tender.

Every steel building page and engineering guide

Grey steel-clad commercial workshop and trade depot with three white roller shutter doors on a gravel yard

Check your per-m² budget before a fabricator rings

Pick the building type, rough m² footprint and cladding or slab scope. When you want a written tender, your details go to a single Irish steel fabricator in your county.