Steel buildings with mezzanines, offices and roller shutters

Adding a freestanding structural steel mezzanine floor inside a commercial steel building runs €110 to €170/m² of upper deck ex VAT (including steel beams, 38 mm decking, staircase, handrail and pallet gate). Designing the main portal building at 6.0 m to 7.0 m eaves from day one gives full 2.7 m clear height both above and below the mezzanine.

Doubling usable space inside a 6–7 m eave portal building with steel upper decks, trade counters and insulated loading doors.

Free, no obligation. One local fabricator prices it, not five.

  • €110–€170/m²structural mezzanine deck installed
  • 6.0–7.0 meaves needed for two full storeys
  • 4.8 kN/m²standard 500 kg/m² storage load
  • €3,400–€7,200insulated sectional loading door
Commercial steel warehouse interior with open steel roof trusses, steel staircase to mezzanine offices and power-floated concrete floor

Designing a portal frame around a mezzanine and office core

Adding offices and parts storage over a trade counter or dispatch bay is one of the lowest-cost ways to expand commercial floor space in Ireland because it sits inside the same roof and concrete footprint. The mistake to avoid is building at 4.5 m eaves and trying to squeeze a mezzanine in afterwards: allowing 350 mm for steel beam depth and decking leaves cramped ceilings. Specifying 6.0 m to 6.5 m eaves at tender stage delivers 3.0 m ground clearance under the deck and 2.6 m+ finished ceiling height in upper offices.

Office / light showroom (3.0–3.5 kN/m²)

Installed deck cost
€105–€145/m²
Typical commercial use
First-floor offices, canteen, display area and glazed trade-counter balcony.

Standard industrial storage (4.8 kN/m²)

Installed deck cost
€110–€170/m²
Typical commercial use
Parts shelving, archive storage and pallet-gate loading (500 kg/m² UDL).

Heavy production / dense stock (7.5–10 kN/m²)

Installed deck cost
€170–€245/m²
Typical commercial use
Heavy machinery, packed euro-pallets and reinforced floor slab pads underneath.

Price my steel building

Four quick taps and our Irish guide price shows before we ask for a phone number. One local fabricator rings you, not five.

A bespoke commercial steel building, around 350 m² (200 to 500 m²), insulated shell with C35 slab, mezzanine and shutters: €224,000 to €322,000 (€640–€920/m²), ex VAT.

Step 1 of 5

What kind of steel building?

Pick the closest match. The fabricator confirms span and eaves height on site.

How the m² price is worked out

Figures reflect going Irish supply-and-erect rates ex VAT for CE-marked IS EN 1090-2 portal-frame buildings at typical 4 m to 6 m eaves. Shell rates cover fabricated columns, rafters, purlins, wind bracing, sheeting, gutters and erection on a prepared base. Insulated options add 60–100 mm PIR composite panels and roller doors. Slab options add excavated pad footings and a 150–200 mm power-floated C35 floor. Exposed Atlantic wind zones, rock excavation, three-phase ESB connections and BCAR fees are priced on survey.

Fire rating, slab pads and Building Control for mezzanines

  • Dedicated slab thickness under mezzanine legs. Mezzanine column baseplates concentrate 40 to 120 kN point loads; verify minimum 175–200 mm C35 slab or local thickened pads beneath the grid.
  • 60-minute fire rating under office decks. Under Part B (Fire Safety), mezzanines used for offices or exceeding threshold areas/travel distances need 60-minute fire-rated suspended ceilings, column casings and cavity barriers.
  • Part M stairs and platform lift checks. Where staff or visitors use upper offices, Disability Access Certificate design sets ambulant-disabled stair geometry and lift requirements.
  • Coordinating windows and roller shutters. Align ribbon office glazing and 4 m × 4.5 m insulated sectional doors directly into the structural side-rail steelwork before fabrication.

Key questions before ordering structural steel

How high do eaves need to be for a mezzanine floor inside a steel building?

Aim for at least 6.0 m to 6.5 m clear eaves height. That leaves 2.8 m to 3.0 m clear below the mezzanine beams and comfortable headroom above for offices or shelving.

Does a mezzanine floor need a Fire Safety Certificate in Ireland?

Yes. Installing a mezzanine adds new usable floor area inside a commercial building, triggering a Fire Safety Certificate application and, where staff or offices occupy the upper floor, a Disability Access Certificate.

Can a mezzanine be bolted straight onto an existing concrete floor?

Only after checking slab thickness, concrete grade and sub-base bearing capacity. Standard 150–200 mm C35 reinforced slabs handle light-to-medium mezzanine grids with spreader plates; heavy loads need saw-cut local pad footings.

What does a 350 m² steel building with a mezzanine, C35 slab and shutters cost?

A 350 m² turnkey shell with C35 floor slab, steel mezzanine deck and electric roller shutters typically budgets around €224,000 to €322,000 ex VAT before bespoke office partitions and HVAC fit-out.

Every steel building page and engineering guide

Grey steel-clad commercial workshop and trade depot with three white roller shutter doors on a gravel yard

Check your per-m² budget before a fabricator rings

Pick the building type, rough m² footprint and cladding or slab scope. When you want a written tender, your details go to a single Irish steel fabricator in your county.