Steel building fabricators across all 26 counties

Every county in the Republic of Ireland is covered. Choosing your county on step 4 routes your footprint and specification to one Irish steel fabricator working in your region.

County selection matches your building to an Irish structural steel fabricator who designs for local wind exposure and delivers directly to your site.

Free, no obligation. One local fabricator prices it, not five.

  • 26 countiesfabricators & crane crews nationwide
  • 24–30 m/sIrish Eurocode 1 wind-zone spread
  • 1 fabricatorprices your spec, never five
  • 410,205active Irish enterprises, CSO 2024
Twin-span profiled steel industrial warehouse with wide sliding doors and daylight clerestory panels

Regional wind loading and delivery across Ireland

Dublin & East Leinster (Dublin, Kildare, Meath, Wicklow, Louth, Wexford)

Typical Eurocode 1 wind exposure
Moderate to coastal (26–28 m/s)
Local build considerations
Business park boundary fire ratings, tight articulated steel access and Part L NZEB checks.

Midlands & South-East (Laois, Offaly, Westmeath, Longford, Carlow, Kilkenny, Tipperary, Waterford)

Typical Eurocode 1 wind exposure
Inland sheltered to exposed (24–27 m/s)
Local build considerations
Strong transport hubs along M7/M8/M9 corridors; cost-effective wide-span logistics depots.

South-West & Mid-West (Cork, Limerick, Kerry, Clare)

Typical Eurocode 1 wind exposure
Exposed coastal to severe Atlantic (27–30 m/s)
Local build considerations
Higher portal rafter sections, marine C4/C5 coating specs near coast and deeper wind-uplift pads.

West & North-West (Galway, Mayo, Sligo, Roscommon, Leitrim, Donegal, Cavan, Monaghan)

Typical Eurocode 1 wind exposure
Severe Atlantic seaboard (27–30 m/s)
Local build considerations
Mandatory wind-lock industrial roller shutters, close side-rail spacing and galvanised structural steel.

Why county selection changes both engineering and cost: a 20 m clear-span portal frame carries heavier universal beams and larger concrete pad footings on an exposed Donegal or Clare headland than on a sheltered Laois site. Using a fabricator covering your county also avoids empty back-haul charges on 40-foot flatbed steel deliveries and mobile cranes.

Price my steel building

Four quick taps and our Irish guide price shows before we ask for a phone number. One local fabricator rings you, not five.

A commercial steel workshop, around 150 m² (80 to 200 m²), 60–100 mm PIR insulated shell erected: €60,000 to €84,000 (€400–€560/m²), ex VAT.

Step 1 of 5

What kind of steel building?

Pick the closest match. The fabricator confirms span and eaves height on site.

How the m² price is worked out

Figures reflect going Irish supply-and-erect rates ex VAT for CE-marked IS EN 1090-2 portal-frame buildings at typical 4 m to 6 m eaves. Shell rates cover fabricated columns, rafters, purlins, wind bracing, sheeting, gutters and erection on a prepared base. Insulated options add 60–100 mm PIR composite panels and roller doors. Slab options add excavated pad footings and a 150–200 mm power-floated C35 floor. Exposed Atlantic wind zones, rock excavation, three-phase ESB connections and BCAR fees are priced on survey.

Preparing your site for steel delivery

  • Articulated lorry turning radius. Structural steel rafters up to 14 m long arrive on flatbed artics; confirm gate width and overhead ESB wires beforehand.
  • Hardcore crane standing pad. Mobile cranes and telehandlers require compacted Clause 804 stone around the perimeter so outriggers sit level in wet weather.
  • Certified pad levels. Holding-down bolt positions and concrete pad top levels must be surveyed to +/-5 mm before steel erection day.

Read Irish wind zones and EN 1090-2 and build timeline and crane erection.

Key questions before ordering structural steel

Do fabricators cover rural townlands as well as Dublin and Cork?

Yes. Structural steel fabricators operate across all 26 counties, serving regional industrial parks, rural trade yards, domestic sites and equestrian estates.

Does wind exposure in western counties increase steel building cost?

Exposed Zone 3 and Zone 4 sites near the Atlantic require heavier steel section weights, closer purlin centres and wind-locked shutters, typically adding 5% to 12% to frame cost versus sheltered inland sites.

Will more than one steel company ring me?

No. Your request goes exclusively to a single Irish steel fabricator in your county.

Every steel building page and engineering guide

Grey steel-clad commercial workshop and trade depot with three white roller shutter doors on a gravel yard

Check your per-m² budget before a fabricator rings

Pick the building type, rough m² footprint and cladding or slab scope. When you want a written tender, your details go to a single Irish steel fabricator in your county.